Another example of wonderful planning. A tunnel between Penn Station and Grand Central Terminal. This will solve ... what exactly? I mean, the choke point in the whole sorry mess is the fact that of the four tunnels under the East River, only two are signaled in both directions allowing for bi-directional travel without the need for time-consuming emergency train orders. One of the two is permanently assigned to Amtrak traffic. The other two tunnels are signaled in one direction only. One is signaled into Manhattan, the other out of it. Thus traffic will be disrupted in 3/4 of the possible tunnel signal outages (since if Amtrak's tunnel is lost, they immediately take possession of the other bi-directional tunnel (which means effectively that the bi-directional tunnel is twice as likely to fail as any of the others from the LIRR point of view. Hidden textThe utterly stupid part of all this is that the tunnels flooded during superstorm Sandy and the signals had to be replaced using "Obama Dollars". Instead of wiring them properly (as had been known to be needed for at least the 33 years I've been travelling on the LIRR) They put them back the same retarded way they were before the flood happened. So the extra Grand Central traffic will not only add to the system congestion, it will be f*cked-up by the same tunnel idiocy from which the existing network suffers.